Cable-stayed bridge connecting My Tho to Ben Tre — a symbol linking both banks of the Tien River. Inaugurated in 2009, 8.3 km long, the first cable-stayed bridge designed and built entirely by Vietnam.
Opening Hours
24/7 (cầu giao thông)
Admission
Miễn phí
Best Time to Visit
Chiều hoàng hôn; quanh năm
Getting There
Trên QL60, cách trung tâm Mỹ Tho 5 km.
For reference only — please confirm directly with the venue before visiting.
Get Directions on Google Maps


